MTA NYCT: Brooklyn
6 Stations, 17 Elevator Upgrades
MTA Brooklyn Elevator Upgrades, Brooklyn, NY
Seventeen elevators, seven of them at Atlantic Avenue.

Project Brief

KeRi provided MEP and fire alarm engineering for the replacement of 17 passenger elevators at six Brooklyn subway stations: Church Ave, Utica Ave / Crown Heights, Prospect Park, Stillwell Ave, DeKalb Ave and Atlantic Ave / Pacific St. It is the largest share of a New York City Transit program replacing 37 elevators at 15 stations across four boroughs, with Stantec as lead designer.

Atlantic Ave / Pacific St. alone accounts for seven high volume elevators across its Fourth Avenue, Eastern Parkway and Brighton line platforms, and every station stays open to the public and fully functional throughout construction. For each elevator KeRi designed new power and distribution, controls and lighting, machine room ventilation with fire and smoke dampers, heat tracing, sump pumps, and fire alarm devices in the machine rooms and shafts.

MEP Engineering Scope

MTA Brooklyn Elevator Upgrades interior

What We Engineered

Elevator replacement MEP and fire alarm scope, repeated at each elevator:

  • New electrical power systems and distribution panels for each elevator
  • New elevator controls and lighting
  • Machine room HVAC with fire and fire/smoke dampers, and heat tracing for piping
  • New sump pumps replacing aging units
  • New fire alarm devices within the elevator machine rooms and shafts

Stations & Elevators

StationTrainsMR #Elevator #QtyHigh Volume
Church Ave253563211No
Utica Ave / Crown Heights34345322, 3232Yes
Prospect ParkBQ042382, 3832No
Stillwell AveDFNQ058701, 7022No
DeKalb AveBDNRWQ026370, 371, 3723No
Atlantic Ave / Pacific St.DNR027301, 302, 3033Yes
Atlantic Ave / Pacific St.DNR338304, 3052Yes
Atlantic Ave / Pacific St.2345BQ040306, 3072Yes
6 Stations179 high volume

MR # is the MTA master reference number for the station complex. Train service as listed in the contract station list.

The Challenge

The elevators and their machine rooms were at end of life: aging 208V / 3-phase distribution, fluorescent lighting on ballasts, battery-pack emergency lighting, exhaust-fan-only HVAC without fire or smoke dampers, old sump pumps, and outdated fire alarm devices, all in stations that must stay open to the public and fully functional throughout the work.

Our Solution

KeRi designed new elevator power, controls, lighting, sump pumps, HVAC with proper damper protection, and fire alarm devices for every elevator, sequenced so each station keeps accessible service while its elevators are replaced.

Previous Project MTA Manhattan Elevator Upgrades Next Project MTA Queens Elevator Upgrades