Project Brief
KeRi provided HVAC and controls upgrades across multiple Bernards Township facilities. The Municipal Building received a new high-efficiency Variable Refrigerant Flow (VRF) system replacing the existing two-pipe fan-coil system, with new direct digital controls operating all units from a central workstation. The Library HVAC upgrade incorporated acoustical considerations and dehumidification to preserve books and artifacts, and the Police Headquarters HVAC system was upgraded to resolve temperature and humidity control issues.
MEP Engineering Scope

What We Engineered
HVAC and controls upgrades across the township facilities:
- Municipal Building: new high-efficiency VRF system replacing the two-pipe fan-coil system
- New direct digital controls operating all units from a central workstation
- Library: HVAC upgrade with acoustical and dehumidification design to preserve books and artifacts
- Police Headquarters: HVAC upgrade resolving temperature and humidity control issues
The Challenge
A municipal building, a library with books and artifacts to protect, and a police headquarters each had distinct comfort and humidity demands under one township program.
Our Solution
KeRi gave the Municipal Building a high-efficiency VRF system with central DDC, designed the Library upgrade with acoustic and dehumidification considerations to protect collections, and resolved the Police HQ temperature and humidity issues.
Previous Project NYPA Headquarters Next Project Carteret Waterfront
