Tiernan Hall, Lab 208 Renovation
Design new chemistry lab for higher education learning including Fume Hoods and point of use exhaust. Perform load calculations to ensure the existing system is capable to accommodate the added heat loads. Provide new VAV boxes connected to the existing HVAC system and upgrade the controls for the new system.