New Generators for Apartment Complexes on 3 Separate Spectrum for Living Campuses
Projects consisted of a providing an optional stand-by system for several apartment buildings at sites measuring a combined 264,000 sf. New natural gas generators were installed at the sites, including all-new exterior electrical distribution equipment with transfer switches to deliver the
optional stand-by power to each apartment. The existing gas services were upgraded, which included gas boosters and new gas piping for the generators.
Description:
Spectrum for Living
Closter, NJ; Ringwood, NJ; and River Vale, NJ
May 2024 (Closter); Mar 2024 (Ringwood); July 2023 (River Vale)
Multi-Family Residential