Passaic Towers: HVAC Replacement
for a 135-Unit Apartment Complex
Passaic Towers, Passaic, NJ
135 apartments re-conditioned and individually metered.

Project Brief

KeRi designed the HVAC replacement for the 135-unit Passaic Towers apartment complex. The work involved removing the existing 800-Ton chiller and its associated cooling tower along with the old, inefficient low-pressure fire-tube steam boilers, and removing the existing fan coil units with their associated piping and power. KeRi developed options to replace the existing system with a new high-efficiency VRF system and a cost-effective PTAC system, and upgraded the electrical system to convert from master metering to individual tenant metering.

MEP Engineering Scope

Passaic Towers interior

What We Engineered

HVAC replacement and electrical metering upgrade for the 135-unit complex:

  • Removal of the existing 800-Ton chiller, cooling tower, and low-pressure steam boilers
  • Removal of existing fan coil units, piping, and power
  • New high-efficiency VRF system option
  • Cost-effective PTAC system option
  • Electrical upgrade from master metering to individual tenant metering

The Challenge

Replacing an aging 800-ton chiller plant and steam boilers at a 135-unit complex meant choosing the right system and shifting residents to fair, individual metering.

Our Solution

KeRi removed the old chiller, cooling tower, boilers, and fan coils, developed high-efficiency VRF and cost-effective PTAC options, and upgraded the electrical from master metering to individual tenant metering.

Previous Project Brightwater Court Next Project Blaine Apartments

Have a project like this?

The earliest conversations are where the most value gets engineered in. Tell us what you are trying to build, and we will tell you which of our teams should be at the table.

Start a Conversation