Project Brief
The design involved an upgrade of the HVAC system for the building. The system design consists of a hydronic system with a packaged air-cooled chiller, chilled-water pumps, chilled-water piping and appurtenances, and an air-side system with air-handling units and ductwork distribution with terminal VAV boxes and sound traps. The design included a new BMS controls system to control the hydronic and air-side systems.
MEP Engineering Scope

What We Engineered
HVAC systems upgrade for Building 685:
- Hydronic system with a packaged air-cooled chiller, chilled-water pumps, and piping
- Air-side system with air-handling units and ductwork distribution
- Terminal VAV boxes and sound traps
- New BMS controls for the hydronic and air-side systems
The Challenge
Upgrading Building 685's HVAC at West Point required a reliable hydronic and air-side design meeting federal standards.
Our Solution
KeRi designed a hydronic system with a packaged air-cooled chiller, pumps and piping, air handlers with VAV terminals and sound traps, and a new BMS controlling both the hydronic and air-side systems.